Works


Know our work selecting the state or country that interests you.

PANAMÁ

Autopista

PYCSA PANAMÁ, S.A.

Highway in Panama to communicate Pacific and Atlantic oceans (Panama City, Madden first stage) with a drilling and blasting volume of 670,000 m3, from March 1998 to February 1999.

MECO SANTA FE.

In the expansion of Panama Canal, Gold Hill project, 30,000 m were drilled from October to December 1998.

JUDITA EXPRESS, S.A.

For the project ICA Panama South Corridor, 180,000 m3 were drilled from April to June 1999.

CANTERA HÉRCULES PANAMÁ.

In Hercules Quarry 135,000 m3 were drilled and blasted from April to June 1999.

PYCSA PANAMÁ S.A.

Peripheral Corridor in Panama, executing 500,000 m3 of drilling and blasting, from March 2003 to August 2004.

SONORA

Minería

MINERA REAL DE ÁNGELES, S.A. DE C.V.

In the state of Sonora, year 1986, with the project “Nuevo Mulatos” the tunnel was amplified by 80m and an advance of 100 m was made with a section of 2x2m.

COMPAÑÍA MINERA DE CANANEA, S.A. DE CV.

In the state of Sonora, from the year 1989 to 1990, drilling and exploration for 60,000 with rotary. and the rehabilitation of 500 m with ademe in tunnels.

MEXICANA DE CANANEA, S.A. DE CV. .

In the State of Sonora, from 1990 to 1991, exploration drilling with diamond for 5,000.

MATERIAS PRIMAS MAGDALENA, S.A. DE CV.

Sonora State, from April to September of 1991, digging and ademe of 100 m of tunnel for exploration with section of 2.5x2.5m and rehabilitation of 100 m.

EXPLORACIONES EL DORADO, S.A. DE CV.

In the State of Sonora, from February 15 to April 15 of 1997, drilling of 18,000 m with diameter of 4” for preparation of stands for exploration in Mina La Colorada.

PROYECTO UNIDAD MINERA SAN FRANCISCO - EST. LLANO.

MOLIMENTALES DEL NOROESTE, S.A. DE C.V. From June to December 2010, 6 ¾ diameter rotary drilling works, with a total of 112,000 m

PROYECTO UNIDAD MINERA SANTA ELENA.

Mineral oversize elimination in primary breaker, with heavy equipment, excavator 336 DL ME with hydraulic hammer Hydroram HK280S, with an approximate volume of 5,000 m3 from November 2011 to July 2012.

PROYECTO PUERTO PEÑASCO (HOME PORT).

INCOMAQ, S.A. DE C.V. Trabajos de barrenación y voladura para un volumen de 1’000,000 m3 en banco. Selección y cargado de tres tamaños de roca para construcción de escollera para puerto marino con longitud de 1.6 km de largo.

MINAS DE ORO NACIONAL, S.A. DE C.V.

Mulatos, Sahuaripa, Sonora, from February to August 2008, acid water treatment pool construction with drilling, blasting, and hauling for a volume of 288,000 m³.

PROYECTO CORTE EN MATERIAL “C” EN CAMINOS DE ACCESO PARA TRITURADORA Y CONCENTRADORA DE COBRE “ II ”, EN MINA BUENAVISTA DEL COBRE, EN CANANEA, SONORA.

Drilling, blasting, loading and hauling works of material, with an executed volume of 1’100,000 m3.

PROYECTO TAJO LUCY EN UNIDAD MINERA MARÍA.

GRUPO FRISCO. MINERA MARÍA, S.A. DE C.V. CANANEA, SONORA. Drilling, blasting, loading and hauling works at a distance of 11 km, with a total of 4’000,000 tons.

PROYECTO UNIDAD MINERA MARIA

GRUPO FRISCO. MINERA MARÍA, S.A. DE C.V. CANANEA, SONORA. Rock drilling works for 10 m tall banks, with a total of 22’000,000 tons and 50,000 m of precut drilling

PROYECTO UNIDAD MINERA MARIA.

GRUPO FRISCO. MINERA MARÍA, S.A. DE C.V. CANANEA, SONORA. Loading and hauling works for re handling of minerals in leaching beds with a monthly total of 300,000 tons and a project total of 6’000,000 tons.

EXPLORACIONES EL DORADO, S.A. DE CV.

En el estado de Sonora, del 15 de Febrero al 15 de Abril de 1997, barrenación de 18,000 m con diámetro de 4” para preparación de bancos para explotación en Mina La Colorada.

PROYECTO UNIDAD PIEDRAS VERDES.

COBRE DEL MAYO, S.A. DE C.V. ALAMOS, SONORA. Drilling works for 9” diameter production with a monthly length of 15,000 m, for a total of 45,000 in 3 months, from September 26th to December 20th, 2015

PROYECTO UNIDAD PIEDRAS VERDES.

COBRE DEL MAYO, S.A. DE C.V. ALAMOS SONORA. Segundo periodo.Drilling works for 9” diameter production with a monthly length of 15,000 m, for a total of 21,808.90 in 3 months, from June to August, 2015.

Autopistas

PROMOTORA DE INFRAESTRUCTURA MEXICANA, S.A. DE CV.

Sonora, Magdalena de Kino - Tubutama highway, from April to August 1994, with a drilling and blasting volume of 230,000 m3, including drainage works.

PROMOTORA DE INFRAESTRUCTURA MEXICANA, S.A. DE CV.

Release construction in Nogales, Sonora to the border with United States, with a drilling and blasting volume of 500,000 m3, started in January 1996, paused temporary due to economic issues, continued in February 1997 and finished in May 1997.

CONSTRUCCIONES TAFER, S.A. DE C.V.

Coyote - Bacadehuachi road construction from km 0+000 to km 20+200 in Sonora. 20 cm thickness hydraulic base, 100% compacted ASSHTO modified, include material production and its haulages with a volume of 29,800 m3. Asphalt concrete binder supply and placement, including laying and compaction, asphalt and additives, with a volume of 5,780 m3.

PROYECTO CONSTRUCCION DE BOULEVARD PUEBLITOS.

VIAS CONCESIONADAS DEL NORTE, S.A. DE C.V. Boulevard Pueblitos construction, first and second stage, cut, load and haulage, in Nogales, Sonora, with a volume of 47,399 m3 from April 26th to June 13th, 2012, from km 0+000 to km 0+565.

PROYECTO CEMENTERA GRUPO APASCO.

Opening and tuning of limestone exploitation floors in bank, for cement production with Tractor D8T heavy equipment.

PROYECTO ACUEDUCTO INDEPENDENCIA.

GRUPO CONSTRUCTORA TOYSO Loading, unloading and different-diameters pipes alignment work using 2 CAT 330 DL ME excavators.

GLUYAS CONSTRUCCIONES, S.A. DE C.V. Land movement work for 20,000 m³ in gap cut with 2 Terex TA400 articulated trucks, from November 2011 to February 2012.

LIBRAMIENTO ORIENTE DE HERMOSILLO. HERMOSILLO, SONORA.

LIBRAMIENTOS Y PUENTES DE HERMOSILLO, S.A. DE C.V. Earthworks construction from km 512+700 to km 519+700 of the trunk in Hermosillo riddance, with a volume of 350,000 m3, from March to May 2017.

Demoliciones

M. H. CONSTRUCTORES, S.A. DE CV.

At Guaymas town, in the state of Sonora, demolition with the use and management of explosives at the Presidente Hotel in San Carlos, with a volume of 30,000 m3, from the 29 of November to the 16 of December of 1995.

PROMOTORA DE INFRAESTRUCTURA MEXICANA, S.A. DE CV.

At the state of Sonora, demolition with use and management of explosives of the Magdalena bridge in the Magdalena de Kino town, with a volume of 1,500 m3 from the 17 to the 20th of January of 1996.

Obra civil

Construction of 50 homes in the Pueblitos neighborhood in the city of Hermosillo, Sonora, year 2004.

Construction of 50 draining works from Km 1 to 30, Santa Ana – Altar, section in the state of Sonora, year 1996.

Construction of 30 draining works – Magdalena – Tubutama section, in the state of Sonora, year 1996.

Relación de Proyectos Vigentes

MINING UNIT MARÍA. CANANEA, SONORA PROJECT.

MINING MARÍA, S.A. DE C.V. – MINING FRISCO Drilling works for production and pre-break with diameters of 3 ½”, 5 ½” and 9” stands of 10 metersm with a total of 150,595 m drills from abril 2017 to May 2018.

WEST BELTWAY OF HERMOSILLO. HERMOSILLO, SONORA.

BELTWAY and BRIDGES OF HERMOSILLO, S.A. DE C.V. Construction of subgrades and embankments of the access from the km 103+260 to km 106+660 and the km 108+800 to the km 110+500 from the Hermosillo beltway, with a volume of 347,484 m³ of a total of 620,000 m³ till May 2018

CHIHUAHUA

Minería

ROSALES CONSTRUCCIÓN, S.A. DE CV.

In the state of Chihuahua, from June 15 to October 30th of 2005, preparation of the level site and blasting for mining Gammon Lake de México S.A. de CV., at Ocampo, Chihuahua, with a movement of 383,000 m3.

GAMMON LAKE DE MÉXICO, S.A. DE CV.

In Ocampo, Chihuahua, from November 2005 to May 2007, preparation and chop roads in mine, with a drilling volume and blasting of 1´000,000 m3

GAMMON LAKE DE MEXICO, S.A. DE C.V.

In Ocampo, Chihuahua, from January to August 2008, preparation and pit roads in mine, with a drilling and blasting volume of 420,000 m3 and 25,000 m in precut for slopes stabilization.

COEUR MEXICANA, S.A. DE C.V.

Palmarejo, Chihuahua, from June 2008 to March 2009, road construcción with a crest width of 25 m and preparation of bank in pit, with a volume of 366,000 m³ and 40,000 m in precut for slopes stabilization.

PROYECTO UNIDAD MINERA DOLORES.

COMPAÑÍA MINERA DOLORES, S.A. DE C.V. 6 3/4" and 7 1/2" diameter rotary drilling works in 8 y 16 m banks, with a total executed of 90,595 m from January to September 2011.

PROYECTO SAN FRANCISCO DEL ORO.

MINERA SAN FRANCISCO DEL ORO, S.A. DE C.V. Rock drilling works for 7.5 m height, 4 ½” diameter banks, with a total executed of 50,000 m from June to October 2011.

COEUR MEXICANA, S.A. DE C.V.

Palmarejo, Chihuahua from July to December 2009, drilling works for production and precut for slopes stabilization and floor leveling, for a total of 85,000 m.

PROYECTO UNIDAD MINERA MORIS

MINAS SANTA MARIA DE MORIS, S.A. DE C.V. Drilling, blasting, loading and hauling works in pits Creston and San Luis, in Moris mine, in Chihuahua, from May 2007 to August 31th, 2011, with a volume of 3’003,306 m3 and 22,514.50 m of drilling.

PROYECTO UNIDAD MINERA OCAMPO.

GRUPO FRISCO. OCAMPO MINING, S.A. DE C.V. OCAMPO, CHIHUAHUA. Drilling works for 5 ½” diameter pit production, with a total of 1’000,000 tons.

Relación de Proyectos vigentes

MNING UNIT CONCHEÑO. OCAMPO, CHIHUAHUA PROJECT.

MINERA REAL DE ANGELES, S.A. DE C.V. – MINERA FRISCO Drilling, blasting, loading and carrying works, with a total of 38,810,354 tons moved from June 2014 to May 2018.

DURANGO

Minería

DESARROLLO CANORAS, S.A. DE CV.

In the state of Durango, from January 20th to February 11th of 2007, drilling and blasting on stands of 40,000 m3 of concrete to use in the curtain of the hydroelectric dam “Las Truchas”

ZACATECAS

Minería

PROYECTO PREPARACION DE SITIO PARA CONSTRUCCION DE LA PRESA DE JALES NUMERO 6 EN MINERA TAYAHUA.

GRUPO FRISCO. MINERA REAL DE ÁNGELES, S.A. DE C.V. CONCEPCION DEL ORO, ZACATECAS. Land movements for site preparation for Jales dam number 6 construction un Minera Tayahua, including service roads and main road, with a volume of 7’658,204.50 m³.

PROYECTO UNIDAD MINERA PEÑASQUITO.

GRUPO GOLD CORP. MINERA PEÑASQUITO, S.A. DE C.V. MAZAPIL, ZACATECAS. Rock drilling works for 15 m tall bank production with a total of 372,381 m, using 9” drills.

AGUASCALIENTES

Minería

PROYECTO PREPARACION DE SITIO SEGUNDA ETAPA Y FORMACION DE CAMAS DE LIXIVIACION PARA LA UNIDAD MINERA EL PORVENIR.

GRUPO FRISCO. MINERA REAL DE ÁNGELES, S.A. DE C.V. ASIENTOS, AGUASCALIENTES. Land movements for leaching beds formation, service roads, main road, pool, electric substation, in second stage extension in El Porvenir pit, with a volume of 2’130,471 m³.

BAJA CALIFORNIA

Autopistas

PREFABRICACIÓN Y CONSTRUCCIONES, SA. DE CV.

Baja California, from October 1991 to December 1993, Mexicali - Tecate highway, with a drilling and blasting volume of 1’850,000 m3.

INFRAESTRUCTURA VIAL, S.A. DE CV.

Baja California, from January to December 1993, Mexicali - Tecate highway, with a drilling and blasting volume of 800,000 m3.

HENKELS DE MÉXICO, S. DE R.L. DE CV.

150 km long pipeline in Baja California, from Algodones to Tijuana, with drilling and blasting works for a 1.5 x 2.5 m ditch, from September 2001 to April 2002.

HENKELS DE MÉXICO, S. DE R.L. DE CV.

Expansion of the Baja Norte pipeline in Tecate and Tijuana, Baja California, from February the 3rd to May 31th, 2007.

Minería

PROYECTO UNIDAD MINERA SAN FELIPE. SAN FELIPE, BAJA CALIFORNIA.

GRUPO FRISCO. MINERA REAL DE ANGELES, S.A. DE C.V. Drilling works for 9” diameter, 13.5 m deep production with a total of 4’400,000 tons and 85,662 m drilled from September 2015 to August 2017.

Estado de México

Autopistas

GRUPO MEXICANO (DINFRA, S.A. DE CV.)

Mexico - Morelia - Guadalajara highway, from January to March 1994, with a drilling and blasting volume of 800,000 m3.

CONSTRUCTORA LA NACIONAL, S.A. DE CV.

Mexico - Morelia - Guadalajara highway, from January to March 1994, with a drilling and blasting volume of 800,000 m3.

PROMOTORA DE INFRAESTRUCTURA MEXICANA, S.A. DE CV.

Michoacan, Mexico - Morelia - Guadalajara highway, from March to July 1994, with a drilling and blasting volume of 700,000 m3.

PROYECTO CAMINO METLALTEPEC – LAGUNA SECA, ESTADO DE MÉXICO.

VÍAS CONCESIONADAS DEL NORTE, S.A. DE C.V. From km 6+950 to km 13+000, road construction to earthworks level, from October 2009 to February 2010, with a total cut volume and land movements of 250,000 m3.

PROYECTO CAMINO SAN ISIDRO XOCHITLA – RINCON DEL CRISTO, ESTADO DE MÉXICO

VÍAS CONCESIONADAS DEL NORTE, S.A. DE C.V. From km 6+980 to km 29+180, road construction to earthworks level, from March 2010 to February 2011, with a total cut volume and land movements of 500,000 m3.

Michoacán

Autopistas

GRUPO MEXICANO (DINFRA, S.A. DE CV.)

Mexico - Morelia - Guadalajara highway, from January to March 1994, with a drilling and blasting volume of 800,000 m3.

CONSTRUCTORA LA NACIONAL, S.A. DE CV.

Mexico - Morelia - Guadalajara highway, from January to March 1994, with a drilling and blasting volume of 800,000 m3.

PROMOTORA DE INFRAESTRUCTURA MEXICANA, S.A. DE CV.

Michoacan, Mexico - Morelia - Guadalajara highway, from March to July 1994, with a drilling and blasting volume of 700,000 m3.

PROYECTO LIBRAMIENTO MORELIA..

CONSTRUCCIONES URALES, S.A. DE C.V. Land movements works for Morelia western riddance construction, with a volume of 260,000 m3 from November 2014 to June 2015.

PROYECTO LIBRAMIENTO MORELIA.

EQUIVENT, S.A. DE C.V. Y SOCIEDAD MICHOACANA DE CONSTRUCTORES, S.A.P.I. DE C.V. Earthworks, structures and drainage works in Morelia riddance section, km 512+800 to km 516+180 in Michoacan, with an earthwork volume of 1’668,790 m3, from April 2015 to February 2016.

Jalisco

Autopistas

GRUPO MEXICANO (DINFRA, S.A. DE CV.)

Mexico - Morelia - Guadalajara highway, from January to March 1994, with a drilling and blasting volume of 800,000 m3.

CONSTRUCTORA LA NACIONAL, S.A. DE CV.

Mexico - Morelia - Guadalajara highway, from January to March 1994, with a drilling and blasting volume of 800,000 m3.

PROMOTORA DE INFRAESTRUCTURA MEXICANA, S.A. DE CV.

Michoacan, Mexico - Morelia - Guadalajara highway, from March to July 1994, with a drilling and blasting volume of 700,000 m3.

GRAVA Y ARENA DEL SALTO, S.A. DE CV.

Exploitation of different banks for aggregates in Guadalajara, Jalisco, with a volume of 200,000 m3 from May to August 2004.

ARRENTRAC S.A. DE CV.

Mascota - Puerto Vallarta road in Jalisco, with a drilling and blasting volume of 350,000 m3 from November 2004 to March 2005.

CHIAPAS

Autopistas

M.H. CONSTRUCTORES, S.A. DE CV.

Chiapas, Ocozocoautla - Raudales highway, from July 1994 to September 1995, with a drilling and blasting volume of 1’500,000 m3.

TRITURADOS BASÁLTICOS Y DERIVADOS, S.A. DE CV.

San Cristobal de las Casas - Chiapas de Corzo highway, with a drilling and blasting volume of 1’100,000 m3, from March the 1st, 2000 to February 28th, 2001.

INGENIEROS Y CONTRATISTAS, S.A. DE CV.

San Cristobal de las Casas - Chiapas de Corzo highway in San Cristobal bridge, with a drilling and blasting volume of 100,000 m3, from July to August 2001.

TRITURADOS BASÁLTICOS Y DERIVADOS, S.A. DE CV.

Las Choapas – Raudales, Mal Paso, Chiapas highway, with a drilling and blasting volume of 500,000 m3, from November the 3rd, 2001 to March the 1st, 2002.

GUERRERO

PROYECTO UNIDAD MINERA LOS FILOS.

GRUPO GOLDCORP (Desarrollos mineros San Luis, S.A de C.V.) Rock drilling works for 7 and 13 m height banks with rotary DM45, with a total og 122,138 m and rock drilling works for 13 m height with Hydratrack SCH 5000CL with a total of 67,137 m from March to December 2012.

Autopistas

OMEGA CONSTRUCCIONES INDUSTRIAL, S.A. DE CV.

Ixtapa - Zihuatanejo four lane highway construction, with a drilling and blasting volume of 150,000 m3, from November 1997 to February 1998.

NAYARIT

Autopistas

CÓNICO S.A. DE CV.

Access road construction for Hydroelectric Dam “El Cajon” project in Nayarit, from July to December 2002, in the first stage with a volume of 300,000 m3.

GRAVA Y ARENA DEL SALTO S.A. DE CV.

Exit portal in diversion tunnels 1 and 2 for Hydroelectric Dam “El Cajon” project in Nayarit, from May t0 August 30th, 2003, with a volume of 250,000 m3.

CONSTRUCTORA EL CAJÓN, S.A. DE C.V. (CECSA)

Bridge over Santiago river, pile #3 margin right for Hydroelectric Dam “El Cajon” project in Nayarit, from May t0 August 30th, 2003, with a drilling and blasting volume of 18,000 m3.

CONSTRUCTORA MOLIBDENO S.A. DE CV. A. EN P. CC. INGENIERIA Y PROYECTOS S.A. DE CV.

San Pedro Ixcatan - Jesus Maria highway from km 17+000 to km 22+000 in Ruiz - Zacatecas highway in Nayarit. Earthworks construction to subgrade level, with drainage works and masonry walls, with a volume in cut of 545,000 m3 and 384,000 m3 in embankments, from January the 2nd to October 2006.

Obra Civil

Construction of 50 bridges works, Estacion Ruiz section, in the state of Nayarit, from 2006, 2007.

SINALOA

Autopistas

CONSTRUCCIONES TAFER, S.A. DE C.V.

Access road from Choix, Sinaloa to Sauzal mine, section #2, with a volume of 400,000 m3 from August 2003 to April 2004.