+80

COMPLETED PROJECTS

+27M

M³ EARTHMOVING

+126M

TON LOAD AND HAUL

+2.4M

METERS DRILLED

+16

STATES IN MEXICO AND ABROAD

Filter by Region

Filter by Status

Completed projects
No projects
Estado

FEATURED PROJECTS

MINERA REAL DE ÁNGELES

In the state of Sonora, in 1986, in the "Nuevo Mulatos" project, approximately 80 m of tunnel was expanded and an advance of 100 m was made with sec...

1986-1986 Sahuaripa, Sonora Minería
PROJECT COMPLETED
COMPAÑÍA MINERA DE CANANEA

State of Sonora, from 1989 to 1990, drilling and exploration for 60,000 m with rotary, as well as rehabilitation of 500 m with support in tunnels.

1989-1990 Cananea, Sonora Minería
PROJECT COMPLETED
MEXICANA DE CANANEA

State of Sonora, year 1990 to 1991, diamond exploration drilling for 5,000 m.

1990-1991 Cananea, Sonora Minería
PROJECT COMPLETED
PREFABRICACIÓN Y CONSTRUCCIONES

State of Baja California Norte, from October 1991 to December 1993, Mexicali - Tecate highway, with a drilling and blasting volume of ...

1991-1993 Mexicali, Baja California Construcción
PROJECT COMPLETED
MATERIAS PRIMAS MAGDALENA

State of Sonora, from April to September 1991, excavation and support of 100 m of tunnel for exploration with a section of 2.5 x 2.5 m and rehabilitation...

1991-1991 Magdalena, Sonora Minería
PROJECT COMPLETED
INFRAESTRUCTURA VIAL

State of Baja California Norte, from January to April 1993, Mexicali - Tecate highway, with a drilling and blasting volume of 800,000 m3

1993-1993 Mexicali, Baja California Construcción
PROJECT COMPLETED
GRUPO MEXICANO

Mexico - Morelia - Guadalajara highway, start of work in January 1994, and completion in March of the same year, with a drilling and vo...

1994-1994 Morelia, Michoacán Construcción
PROJECT COMPLETED
CONSTRUCTORA LA NACIONAL

Mexico - Morelia - Guadalajara highway, start of work in January 1994 and completion in March of the same year, with a drilling and vol...

1994-1994 Morelia, Michoacán Construcción
PROJECT COMPLETED
PROMOTORA DE INFRAESTRUCTURA MEXICANA

State of Michoacán, Mexico - Morelia - Guadalajara highway, start of work in March 1994 and completion in July of the same year, with a volume ...

1994-1994 Morelia, Michoacán Construcción
PROJECT COMPLETED
M.H. CONSTRUCTORES

In the state of Chiapas the Ocozocoautla-Raudales highway was built, starting in July 1994 and ending in September 1995, with a vol...

1994-1995 Ocozocoautla, Chiapas Construcción
PROJECT COMPLETED
M. H. CONSTRUCTORES

In the municipality of Guaymas, in the state of Sonora, demolition with use and handling of explosives at the Presidente hotel in San Carlos, with a volume ...

1995-1995 Guaymas, Sonora Demoliciones
PROJECT COMPLETED
CONSTRUCCION DE 50 OBRAS DE DRENAJE

Construction of 50 drainage works from Km 1 to 30, Santa Ana - Altar section, in the State of Sonora, year 1996.

1996-1996 Santa Ana, Sonora Construcción
PROJECT COMPLETED
CONSTRUCCION DE 30 OBRAS DE DRENAJE

Construction of 30 drainage works, Magdalena - Tubutama section, in the State of Sonora, year 1996.

1996-1996 Magdalena de Kino, Sonora Construcción
PROJECT COMPLETED
EXPLORACIONES EL DORADO

In the state of Sonora, from February 15 to April 15, 1997, drilling of 18,000 m with 4" diameter for bench preparation for explot...

1997-1997 La colorada, Sonora Minería
PROJECT COMPLETED
OMEGA CONSTRUCCIONES INDUSTRIAL

Construction of four-lane highway Ixtapa-Zihuatanejo, Guerrero, with a volume of 150,000 m3 of drilling and blasting. Start of work ...

1997-1998 Zihuatanejo, Guerrero Construcción
PROJECT COMPLETED
AMPLIACIÓN CANAL PANAMÁ (GOLD HILL)

In the expansion of the Panama Canal, Project (Gold Hill) 30,000 m were drilled from October to December 1998.

1998-1998 Panamá, Panamá Construcción
PROJECT COMPLETED
PYCSA PANAMÁ

Highway in the Republic of Panama for communication of the Pacific with the Atlantic (Panama City, Madden first stage) with a volume of 6...

1998-1999 Panamá, Panamá Construcción
PROJECT COMPLETED
CANTERA HÉRCULES PANAMÁ

At the Hercules Quarry 135,000 m3 were drilled and blasted from April to June 1999.

1999-1999 Panamá, Panamá Construcción
PROJECT COMPLETED
INGENIEROS Y CONTRATISTAS

San Cristobal de las Casas to Chiapas de Corzo highway, with a volume of 1,100,000 m3 of drilling and blasting. Start of work March 1, 2...

2000-2001 San Cristóbal de las Casas, Chiapas Construcción
PROJECT COMPLETED
TRITURADOS BASÁLTICOS Y DERIVADOS

Las Choapas - Raudales highway, Mal Paso, Chiapas, with a volume of 500,000 m3 of drilling and blasting, from November 3, 2001 to ...

2001-2002 Choapas, Chiapas Construcción
PROJECT COMPLETED
HENKELS DE MÉXICO

Gas pipeline in Baja California, from Algodones to Tijuana, with 150 km in length, drilling and blasting work for trench of 1.50 x 2.50 m. In...

2001-2002 Tijuana, Baja California Construcción
PROJECT COMPLETED
CÓNICO

Construction of the access road to reach the P.H. "El Cajón" project. Located in the state of Nayarit. In the period from July to ...

2002-2002 Río Santiago, Nayarit Construcción
PROJECT COMPLETED
GRAVA Y ARENA DEL SALTO

Exit portal in the diversion Tunnels 1 and 2 of the P.H. "El Cajón" project, located in the state of Nayarit. In the period from May to 30 d...

2003-2003 Río Santiago, Nayarit Construcción
PROJECT COMPLETED
CONSTRUCTORA EL CAJÓN

Bridge over the "Río Santiago", pier No. 3 right bank. In the P.H. "El Cajón" project, located in the state of Nayarit. In the period del...

2003-2003 Río Santiago, Nayarit Construcción
PROJECT COMPLETED
PYCSA PANAMÁ

Peripheral Corridor in Panama. Executing 500,000 m3 of drilling and blasting in the period March 2003 to August 2004.

2003-2004 Panamá, Panamá Construcción
PROJECT COMPLETED
CONSTRUCCIONES TAFER

Access road from Choix, Sinaloa, to the Sauzal mine, Section No. 2. Volume of 400,000 m3 from August 2003 to April 2004.

2003-2004 Choix, Sinaloa Construcción
PROJECT COMPLETED
COMISIÓN FEDERAL DE ELECTRICIDAD

P.H. "Cajón".- Presidential Blasting (Start of Works of P.H. El Cajón) with contract PHC-CLO-08/03.

2004-2004 Mexicali, Baja California Demoliciones
PROJECT COMPLETED
CONSTRUCCION DE 50 CASAS

Construction of 50 houses in Pueblitos subdivision in the city of Hermosillo, Sonora, year 2004.

2004-2004 Hermosillo, Sonora Construcción
PROJECT COMPLETED
GRAVA Y ARENA DEL SALTO

Exploitation of different banks for aggregates in Guadalajara, Jalisco. With a volume of 200,000 m3 from May to August 2004.

2004-2005 Guadalajara, Jalisco Construcción
PROJECT COMPLETED
ARRENTRAC

Mascota - Puerto Vallarta highway, in the state of Jalisco, with a volume of 350,000 m3 of drilling and blasting. From November 2004 to March...

2004-2005 Puerto Vallarta, Jalisco Construcción
PROJECT COMPLETED
ROSALES CONSTRUCCIÓN

In the state of Chihuahua, from June 15, 2005 to October 30, 2005, site and crusher plant preparation for Gammon La miner...

2005-2005 Ocampo, Chihuahua Minería
PROJECT COMPLETED
GAMMON LAKE DE MÉXICO

In Ocampo, Chihuahua, from November 2005 to May 2007, preparation and pit roads in mine, with a drilling and blasting volume of 1'...

2005-2007 Ocampo, Chihuahua Minería
PROJECT COMPLETED
CONSTRUCCION DE 50 PUENTES

Construction of 50 Bridge Works, Estación Ruiz Section, in the State of Nayarit, years 2006, 2007.

2006-2007 Ruiz, Nayarit Construcción
PROJECT COMPLETED
DESARROLLO CANORAS

In the state of Durango, from January 20 to February 11, 2007, 40,000 m of drilling and blasting on benches for concrete aggregates to uti...

2007-2007 Canelas, Durango Minería
PROJECT COMPLETED
UNIDAD MINERA MORIS

MINAS SANTA MARIA DE MORIS, S.A. DE C.V. Drilling, blasting, loading and hauling work in the Creston and San Luis pits, at the Moris mine, e...

2007-2011 Moris, Chihuahua Minería
PROJECT COMPLETED
MINAS DE ORO NACIONAL

Mulatos, Municipality of Sahuaripa, Sonora, from February to August 2008, construction of acid water treatment pool with drilling, blasting...

2008-2008 Sahuaripa, Sonora Minería
PROJECT COMPLETED
COEUR MEXICANA (PALMAREJO)

Palmarejo, Chihuahua, from June 2008 to March 2009, construction of roads with a crown width of 25 m and bench preparation in pit, with...

2008-2009 Palmarejo, Chihuahua Minería
PROJECT COMPLETED
UNIDAD MINERA SAN FRANCISCO

MOLIMENTALES DEL NOROESTE, S.A. DE C.V. From June to December 2010. Rotary drilling work with a diameter of 6 ¾, with a total of 1...

2010-2010 Santa Elena, Sonora Minería
PROJECT COMPLETED
CAMINO SAN ISIDRO XOCHITLA

VÍAS CONCESIONADAS DEL NORTE, S.A. DE C.V. From Km 6 + 980 to 29 + 180, road construction at terrace level, period from March 2010 to February...

2010-2011 Rincón del Cristo, México Construcción
PROJECT COMPLETED
UNIDAD MINERA DOLORES

COMPAÑÍA MINERA DOLORES, S.A. DE C.V. Rotary drilling work with 6" diameter on benches of 8 and 16 m, with a total executed of 90,595 m d...

2011-2011 Madera, Chihuahua Minería
PROJECT COMPLETED
SAN FRANCISCO DEL ORO

MINERA SAN FRANCISCO DEL ORO, S.A. DE C.V. Rock drilling work for benches of 7.5 mts height, with diameter of 4 ½" with a total execu...

2011-2011 San Francisco del Oro, Chihuahua Minería
PROJECT COMPLETED
CEMENTERA GRUPO APASCO

Opening and related floor work in limestone exploitation bench, for cement production with D8T Tractor heavy equipment.

2011-2011 Hermosillo, Sonora Construcción
PROJECT COMPLETED
UNIDAD MINERA SANTA ELENA

Elimination of oversized ore in primary crusher, with 336 DL ME excavator heavy equipment, with Hydroram HK280S hydraulic hammer, with...

2011-2012 Banamichi, Sonora Minería
PROJECT COMPLETED
UNIDAD MINERA LOS FILOS

GRUPO GOLDCORP (Desarrollos mineros San Luis, S.A de C.V.) Rock drilling work for benches of 7 and 13 mts height with DM45 rotary, co...

2012-2012 Eduardo Neri, Guerrero Minería
PROJECT COMPLETED
CORTE EN MATERIAL C EN CAMINOS

GLUYAS CONSTRUCCIONES, S.A. DE C.V. Drilling, blasting, loading and hauling work, with an executed volume of 1,100,000 m3

2012-2012 Cananea, Sonora Minería
PROJECT COMPLETED
PREPARACION DE SITIO PARA CONSTRUCCION

GRUPO FRISCO. MINERA REAL DE ÁNGELES, S.A. DE C.V. CONCEPCION DEL ORO, ZACATECAS. Earthworks for site preparation for construc...

2012-2012 Mazapil, Zacatecas Minería
PROJECT COMPLETED
PREPARACION DE SITIO SEGUNDA ETAPA

GRUPO FRISCO. MINERA REAL DE ÁNGELES, S.A. DE C.V. ASIENTOS, AGUASCALIENTES. Earthworks for formation of leaching beds, roads ...

2012-2012 Noria de Angeles, Zacatecas Minería
PROJECT COMPLETED
TAJO LUCY EN UNIDAD MINERA MARÍA

GRUPO FRISCO. MINERA MARÍA, S.A. DE C.V. Drilling, blasting, loading and hauling work at a distance of 11 km, with a total of 4,000,000...

2012-2012 Cananea, Sonora Minería
PROJECT COMPLETED
PUERTO PEÑASCO (HOME PORT)

INCOMAQ, S.A. DE C.V. Drilling and blasting work for a volume of 1,000,000 m3 on bench. Selection and loading of three rock sizes pa...

2012-2012 Puerto Peñasco, Sonora Minería
PROJECT COMPLETED
UNIDAD MINERA PEÑASQUITO

GRUPO GOLD CORP. MINERA PEÑASQUITO, S.A. DE C.V. MAZAPIL, ZACATECAS. Rock drilling work for production on benches of 15 mts height ...

2012-2012 Mazapil, Zacatecas Minería
PROJECT COMPLETED
PROYECTO UNIDAD MINERA OCAMPO

GRUPO FRISCO. OCAMPO MINING, S.A. DE C.V. OCAMPO, CHIHUAHUA. Drilling work for pit production with 5 ½" diameter, with a total of ...

2012-2012 Ocampo, Chihuahua Minería
PROJECT COMPLETED
UNIDAD MINERA MARIA

GRUPO FRISCO. MINERA MARÍA, S.A. DE C.V. CANANEA, SONORA. Rock drilling work for benches of 10 m height, with a total of 22,000,00...

2012-2012 Cananea, Sonora Minería
PROJECT COMPLETED
PROYECTO CONSTRUCCION DE BOULEVARD PUEBLITOS

VIAS CONCESIONADAS DEL NORTE, S.A. DE C.V. Construction of Boulevard Pueblitos, first and second stage, cut, load and haul, in the city of No...

2012-2012 Hermosillo, Sonora Construcción
PROJECT COMPLETED
LIBRAMIENTO MORELIA, MICHOACÁN

CONSTRUCCIONES URALES, S.A. DE C.V. Earthmoving work for construction of Morelia west bypass with a volume of 260,00...

2014-2015 Morelia, Michoacán Construcción
PROJECT COMPLETED
UNIDAD PIEDRAS VERDES

OBRE DEL MAYO, S.A. DE C.V. ALAMOS, SONORA. Drilling work for production with 9" diameter with a monthly footage of 15,000 m, for a ...

2015-2015 Alamos, Sonora Minería
PROJECT COMPLETED
PROYECTO UNIDAD MINERA SAN FELIPE

GRUPO FRISCO. MINERA REAL DE ANGELES, S.A. DE C.V. Drilling work for production with 9" diameter with a depth of 13.5 meters, ...

2015-2017 San Felipe, Baja California Minería
PROJECT COMPLETED
LIBRAMIENTO ORIENTE HERMOSILLO

LIBRAMIENTOS Y PUENTES DE HERMOSILLO, S.A. DE C.V. Construction of earthworks from km 512+700 to km 519+700 of the Hermosil bypass trunk...

2017-2018 Hermosillo, Sonora Vialidades
PROJECT COMPLETED
UNIDAD MINERA MARÍA

MINERA REAL DE ANGELES, S.A. DE C.V. - MINERA FRISCO Drilling, blasting, loading and hauling work, accumulating a total of 52,149,337 tons...

2017-2018 Cananea, Sonora Minería
PROJECT COMPLETED
NUEVO CONSULADO ESTADOS UNIDOS

EMBASSY OF THE UNITED STATES OF AMERICA - BL HARBERT INTERNATIONAL LLC. Demolitions, site preparation, platform construction, with...

2019-2024 Hermosillo, Sonora Construcción
PROJECT COMPLETED
ALTOZANO

GRUPO ALTOZANO, S.A.P.I. DE C.V. Excavations for trenches for electrical, hydraulic and sanitary infrastructure in type "C" material with hammer ...

2020-2020 Hermosillo, Sonora Construcción
PROJECT COMPLETED
PROYECTO VASO 1

CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Construction project for a regulating basin with earthmoving operations.

2021-2021 Minatitlán, Colima Hidráulico
PROJECT COMPLETED
PROYECTO ARRAYANAL

CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Large-scale mining project in Minatitlán, Colima with drilling, blasting, and earthmoving operations.

2021-2022 Minatitlán, Colima Minería
PROJECT COMPLETED
CAMINOS INTERIOR MINA PEÑA COLORADA

CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Construction and surfacing of roads for access to hydraulic works inside the mine.

2021-2022 Minatitlán, Colima Construcción
PROJECT COMPLETED
PROYECTO CONCHEÑO

Completed mining project in the state of Chihuahua.

2022-2022 Ocampo, Chihuahua Minería
PROJECT COMPLETED
PROYECTO VASO 2

CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Completed regulating basin project in Minatitlán, Colima.

2022-2022 Minatitlán, Colima Hidráulico
PROJECT COMPLETED
TREN MAYA – TRAMO 1

OPERADORA CICSA, S.A. DE C.V. & FCC CONSTRUCCIÓN, S.A. Participation in the construction of the Maya Train, one of Mexico's most important infrastructure projects.

2022-2023 Pustunich, Campeche Infraestructura
PROJECT COMPLETED
TREN MAYA – TRAMO 2

OPERADORA CICSA, S.A. DE C.V. & FCC CONSTRUCCIÓN, S.A. Continuation of the Maya Train project with specialized work on subsection 5.

2022-2023 Campeche, Campeche Infraestructura
PROJECT COMPLETED
SERVICIO BARRENACIÓN TREN IMURIS

Linear meter drilling service including machinery, operators, and everything necessary for the execution of works for the Imuris to Nogales train project. Start in January 2024.

2024-2024 Imuris, Sonora Minería
PROJECT COMPLETED
RENTA MAQUINARIA TREN IMURIS

Rental of machinery equipped for the execution of works on the section for the Imuris to Nogales train. Start in June 2024.

2024-2024 Imuris, Sonora Renta Maquinaria
PROJECT COMPLETED
PROYECTO GUÁSIMAS

CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Construction and earthmoving project in Minatitlán, Colima.

2024-2025 Minatitlán, Colima Construcción
PROJECT COMPLETED
CAMINOS FASE 5

CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Road and highway construction project in Minatitlán, Colima.

2024-2025 Minatitlán, Colima Vialidades
PROJECT COMPLETED