+80
COMPLETED PROJECTS
+27M
M³ EARTHMOVING
+126M
TON LOAD AND HAUL
+2.4M
METERS DRILLED
+16
STATES IN MEXICO AND ABROAD
Filter by Region
Filter by Status
FEATURED PROJECTS
MINERA REAL DE ÁNGELES
In the state of Sonora, in 1986, in the "Nuevo Mulatos" project, approximately 80 m of tunnel was expanded and an advance of 100 m was made with sec...
COMPAÑÍA MINERA DE CANANEA
State of Sonora, from 1989 to 1990, drilling and exploration for 60,000 m with rotary, as well as rehabilitation of 500 m with support in tunnels.
MEXICANA DE CANANEA
State of Sonora, year 1990 to 1991, diamond exploration drilling for 5,000 m.
PREFABRICACIÓN Y CONSTRUCCIONES
State of Baja California Norte, from October 1991 to December 1993, Mexicali - Tecate highway, with a drilling and blasting volume of ...
MATERIAS PRIMAS MAGDALENA
State of Sonora, from April to September 1991, excavation and support of 100 m of tunnel for exploration with a section of 2.5 x 2.5 m and rehabilitation...
INFRAESTRUCTURA VIAL
State of Baja California Norte, from January to April 1993, Mexicali - Tecate highway, with a drilling and blasting volume of 800,000 m3
GRUPO MEXICANO
Mexico - Morelia - Guadalajara highway, start of work in January 1994, and completion in March of the same year, with a drilling and vo...
CONSTRUCTORA LA NACIONAL
Mexico - Morelia - Guadalajara highway, start of work in January 1994 and completion in March of the same year, with a drilling and vol...
PROMOTORA DE INFRAESTRUCTURA MEXICANA
State of Michoacán, Mexico - Morelia - Guadalajara highway, start of work in March 1994 and completion in July of the same year, with a volume ...
M.H. CONSTRUCTORES
In the state of Chiapas the Ocozocoautla-Raudales highway was built, starting in July 1994 and ending in September 1995, with a vol...
M. H. CONSTRUCTORES
In the municipality of Guaymas, in the state of Sonora, demolition with use and handling of explosives at the Presidente hotel in San Carlos, with a volume ...
CONSTRUCCION DE 50 OBRAS DE DRENAJE
Construction of 50 drainage works from Km 1 to 30, Santa Ana - Altar section, in the State of Sonora, year 1996.
CONSTRUCCION DE 30 OBRAS DE DRENAJE
Construction of 30 drainage works, Magdalena - Tubutama section, in the State of Sonora, year 1996.
EXPLORACIONES EL DORADO
In the state of Sonora, from February 15 to April 15, 1997, drilling of 18,000 m with 4" diameter for bench preparation for explot...
OMEGA CONSTRUCCIONES INDUSTRIAL
Construction of four-lane highway Ixtapa-Zihuatanejo, Guerrero, with a volume of 150,000 m3 of drilling and blasting. Start of work ...
AMPLIACIÓN CANAL PANAMÁ (GOLD HILL)
In the expansion of the Panama Canal, Project (Gold Hill) 30,000 m were drilled from October to December 1998.
PYCSA PANAMÁ
Highway in the Republic of Panama for communication of the Pacific with the Atlantic (Panama City, Madden first stage) with a volume of 6...
CANTERA HÉRCULES PANAMÁ
At the Hercules Quarry 135,000 m3 were drilled and blasted from April to June 1999.
INGENIEROS Y CONTRATISTAS
San Cristobal de las Casas to Chiapas de Corzo highway, with a volume of 1,100,000 m3 of drilling and blasting. Start of work March 1, 2...
TRITURADOS BASÁLTICOS Y DERIVADOS
Las Choapas - Raudales highway, Mal Paso, Chiapas, with a volume of 500,000 m3 of drilling and blasting, from November 3, 2001 to ...
HENKELS DE MÉXICO
Gas pipeline in Baja California, from Algodones to Tijuana, with 150 km in length, drilling and blasting work for trench of 1.50 x 2.50 m. In...
CÓNICO
Construction of the access road to reach the P.H. "El Cajón" project. Located in the state of Nayarit. In the period from July to ...
GRAVA Y ARENA DEL SALTO
Exit portal in the diversion Tunnels 1 and 2 of the P.H. "El Cajón" project, located in the state of Nayarit. In the period from May to 30 d...
CONSTRUCTORA EL CAJÓN
Bridge over the "Río Santiago", pier No. 3 right bank. In the P.H. "El Cajón" project, located in the state of Nayarit. In the period del...
PYCSA PANAMÁ
Peripheral Corridor in Panama. Executing 500,000 m3 of drilling and blasting in the period March 2003 to August 2004.
CONSTRUCCIONES TAFER
Access road from Choix, Sinaloa, to the Sauzal mine, Section No. 2. Volume of 400,000 m3 from August 2003 to April 2004.
COMISIÓN FEDERAL DE ELECTRICIDAD
P.H. "Cajón".- Presidential Blasting (Start of Works of P.H. El Cajón) with contract PHC-CLO-08/03.
CONSTRUCCION DE 50 CASAS
Construction of 50 houses in Pueblitos subdivision in the city of Hermosillo, Sonora, year 2004.
GRAVA Y ARENA DEL SALTO
Exploitation of different banks for aggregates in Guadalajara, Jalisco. With a volume of 200,000 m3 from May to August 2004.
ARRENTRAC
Mascota - Puerto Vallarta highway, in the state of Jalisco, with a volume of 350,000 m3 of drilling and blasting. From November 2004 to March...
ROSALES CONSTRUCCIÓN
In the state of Chihuahua, from June 15, 2005 to October 30, 2005, site and crusher plant preparation for Gammon La miner...
GAMMON LAKE DE MÉXICO
In Ocampo, Chihuahua, from November 2005 to May 2007, preparation and pit roads in mine, with a drilling and blasting volume of 1'...
CONSTRUCCION DE 50 PUENTES
Construction of 50 Bridge Works, Estación Ruiz Section, in the State of Nayarit, years 2006, 2007.
DESARROLLO CANORAS
In the state of Durango, from January 20 to February 11, 2007, 40,000 m of drilling and blasting on benches for concrete aggregates to uti...
UNIDAD MINERA MORIS
MINAS SANTA MARIA DE MORIS, S.A. DE C.V. Drilling, blasting, loading and hauling work in the Creston and San Luis pits, at the Moris mine, e...
MINAS DE ORO NACIONAL
Mulatos, Municipality of Sahuaripa, Sonora, from February to August 2008, construction of acid water treatment pool with drilling, blasting...
COEUR MEXICANA (PALMAREJO)
Palmarejo, Chihuahua, from June 2008 to March 2009, construction of roads with a crown width of 25 m and bench preparation in pit, with...
UNIDAD MINERA SAN FRANCISCO
MOLIMENTALES DEL NOROESTE, S.A. DE C.V. From June to December 2010. Rotary drilling work with a diameter of 6 ¾, with a total of 1...
CAMINO SAN ISIDRO XOCHITLA
VÍAS CONCESIONADAS DEL NORTE, S.A. DE C.V. From Km 6 + 980 to 29 + 180, road construction at terrace level, period from March 2010 to February...
UNIDAD MINERA DOLORES
COMPAÑÍA MINERA DOLORES, S.A. DE C.V. Rotary drilling work with 6" diameter on benches of 8 and 16 m, with a total executed of 90,595 m d...
SAN FRANCISCO DEL ORO
MINERA SAN FRANCISCO DEL ORO, S.A. DE C.V. Rock drilling work for benches of 7.5 mts height, with diameter of 4 ½" with a total execu...
CEMENTERA GRUPO APASCO
Opening and related floor work in limestone exploitation bench, for cement production with D8T Tractor heavy equipment.
UNIDAD MINERA SANTA ELENA
Elimination of oversized ore in primary crusher, with 336 DL ME excavator heavy equipment, with Hydroram HK280S hydraulic hammer, with...
UNIDAD MINERA LOS FILOS
GRUPO GOLDCORP (Desarrollos mineros San Luis, S.A de C.V.) Rock drilling work for benches of 7 and 13 mts height with DM45 rotary, co...
CORTE EN MATERIAL C EN CAMINOS
GLUYAS CONSTRUCCIONES, S.A. DE C.V. Drilling, blasting, loading and hauling work, with an executed volume of 1,100,000 m3
PREPARACION DE SITIO PARA CONSTRUCCION
GRUPO FRISCO. MINERA REAL DE ÁNGELES, S.A. DE C.V. CONCEPCION DEL ORO, ZACATECAS. Earthworks for site preparation for construc...
PREPARACION DE SITIO SEGUNDA ETAPA
GRUPO FRISCO. MINERA REAL DE ÁNGELES, S.A. DE C.V. ASIENTOS, AGUASCALIENTES. Earthworks for formation of leaching beds, roads ...
TAJO LUCY EN UNIDAD MINERA MARÍA
GRUPO FRISCO. MINERA MARÍA, S.A. DE C.V. Drilling, blasting, loading and hauling work at a distance of 11 km, with a total of 4,000,000...
PUERTO PEÑASCO (HOME PORT)
INCOMAQ, S.A. DE C.V. Drilling and blasting work for a volume of 1,000,000 m3 on bench. Selection and loading of three rock sizes pa...
UNIDAD MINERA PEÑASQUITO
GRUPO GOLD CORP. MINERA PEÑASQUITO, S.A. DE C.V. MAZAPIL, ZACATECAS. Rock drilling work for production on benches of 15 mts height ...
PROYECTO UNIDAD MINERA OCAMPO
GRUPO FRISCO. OCAMPO MINING, S.A. DE C.V. OCAMPO, CHIHUAHUA. Drilling work for pit production with 5 ½" diameter, with a total of ...
UNIDAD MINERA MARIA
GRUPO FRISCO. MINERA MARÍA, S.A. DE C.V. CANANEA, SONORA. Rock drilling work for benches of 10 m height, with a total of 22,000,00...
PROYECTO CONSTRUCCION DE BOULEVARD PUEBLITOS
VIAS CONCESIONADAS DEL NORTE, S.A. DE C.V. Construction of Boulevard Pueblitos, first and second stage, cut, load and haul, in the city of No...
LIBRAMIENTO MORELIA, MICHOACÁN
CONSTRUCCIONES URALES, S.A. DE C.V. Earthmoving work for construction of Morelia west bypass with a volume of 260,00...
UNIDAD PIEDRAS VERDES
OBRE DEL MAYO, S.A. DE C.V. ALAMOS, SONORA. Drilling work for production with 9" diameter with a monthly footage of 15,000 m, for a ...
PROYECTO UNIDAD MINERA SAN FELIPE
GRUPO FRISCO. MINERA REAL DE ANGELES, S.A. DE C.V. Drilling work for production with 9" diameter with a depth of 13.5 meters, ...
LIBRAMIENTO ORIENTE HERMOSILLO
LIBRAMIENTOS Y PUENTES DE HERMOSILLO, S.A. DE C.V. Construction of earthworks from km 512+700 to km 519+700 of the Hermosil bypass trunk...
UNIDAD MINERA MARÍA
MINERA REAL DE ANGELES, S.A. DE C.V. - MINERA FRISCO Drilling, blasting, loading and hauling work, accumulating a total of 52,149,337 tons...
NUEVO CONSULADO ESTADOS UNIDOS
EMBASSY OF THE UNITED STATES OF AMERICA - BL HARBERT INTERNATIONAL LLC. Demolitions, site preparation, platform construction, with...
ALTOZANO
GRUPO ALTOZANO, S.A.P.I. DE C.V. Excavations for trenches for electrical, hydraulic and sanitary infrastructure in type "C" material with hammer ...
PROYECTO VASO 1
CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Construction project for a regulating basin with earthmoving operations.
PROYECTO ARRAYANAL
CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Large-scale mining project in Minatitlán, Colima with drilling, blasting, and earthmoving operations.
CAMINOS INTERIOR MINA PEÑA COLORADA
CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Construction and surfacing of roads for access to hydraulic works inside the mine.
PROYECTO CONCHEÑO
Completed mining project in the state of Chihuahua.
PROYECTO VASO 2
CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Completed regulating basin project in Minatitlán, Colima.
TREN MAYA – TRAMO 1
OPERADORA CICSA, S.A. DE C.V. & FCC CONSTRUCCIÓN, S.A. Participation in the construction of the Maya Train, one of Mexico's most important infrastructure projects.
TREN MAYA – TRAMO 2
OPERADORA CICSA, S.A. DE C.V. & FCC CONSTRUCCIÓN, S.A. Continuation of the Maya Train project with specialized work on subsection 5.
SERVICIO BARRENACIÓN TREN IMURIS
Linear meter drilling service including machinery, operators, and everything necessary for the execution of works for the Imuris to Nogales train project. Start in January 2024.
RENTA MAQUINARIA TREN IMURIS
Rental of machinery equipped for the execution of works on the section for the Imuris to Nogales train. Start in June 2024.
PROYECTO GUÁSIMAS
CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Construction and earthmoving project in Minatitlán, Colima.
CAMINOS FASE 5
CONSORCIO MINERO BENITO JUÁREZ PEÑA COLORADA, S.A. DE C.V. Road and highway construction project in Minatitlán, Colima.